The last internal stuff happens on Monday/Tuesday - new flooring in three rooms, which should help dramatically with Julie's asthma, make the study livable (as the carpet is still the same one that was in there when it was full of dry/wet rot) and stop the hallway being so wobbly. We'll have to juggle things around, as all of the rooms currently have stuff in them, but it's happening over two days, so that should be feasible.
And then the week after we're getting the outside of the flat scraped down and repainted by the insurance company's builders. The water from the leak apparently forced its way through the sandstone wall, turning the front few millimeters into, well, sand. So that's being sorted out and then painted to look nice again. Thank fuck for insurance.
I have no idea what I'm going to stress about when this is all over. Maybe I'll even start sleeping well again!